1.208.275.0011
In 1998 the Douglas County PUD in Washington began a multi-year survival study to determine the survival rate of fish passing through their hydroelectric project (Wells Dam) on the Columbia River. Biomark performed the PIT-tagging, fish husbandry, fish release, data collection and reporting during the three year study. The results from the study exceeded the 93% juvenile project survival standards that were set.
In 2010 Douglas County conducted a study to confirm that survival through the Wells Project for yearling Chinook and steelhead remains equal to or above the 93% juvenile project survival standard. To achieve this goal, Douglas Co. PUD requested Biomark to provide services in five portions of the project.
Wells Dam fish passage survival verification
Wells Hatchery (WA)
82,000
Chinook (Threatened)